Purchase Receipt
The purchase receipt is the gate transaction: produce is weighed, graded and accepted or rejected. Everything downstream depends on getting it right.
Overview
Section titled “Overview”The receipt records gross weight, tare and net weight, and assigns a grade per lot. Net weight and grade together determine what the vendor is paid, so this is the screen with the most direct financial consequence in the application.
Prerequisites
Section titled “Prerequisites”Before you begin
- The party exists and is active
- The items you need exist with a unit of measure
- The financial period you are posting into is open
Opening the screen
Section titled “Opening the screen”- Purchases
- Gate
- Purchase Receipt
Procedure
Section titled “Procedure”Open the gate receipt screen
Go to Purchases → Gate → Purchase Receipt and select the vendor arriving.
Record the vehicle and gross weight
Enter the vehicle number and take the gross weight from the weighbridge. Where the weighbridge is integrated, the reading is captured automatically and cannot be typed over.
Grade each lot
Inspect and assign a grade per lot. The grade differential from the produce master adjusts the rate automatically.
Record rejections
Enter rejected quantity with a reason per lot. Rejected produce is not taken into stock and is not paid for.
Take the tare weight
Weigh the empty vehicle. Net weight is computed as gross less tare less crate weight.
Accept the receipt
Click Accept. Stock increases by the net accepted quantity and the vendor payable is created.
Expected result
Stock rises by the accepted net weight, the receipt gets a number such as GR/2026/04418, and the vendor ledger shows the payable net of commission.
Field reference
Section titled “Field reference”| Field | Type | Required | Default | Description | Notes |
|---|---|---|---|---|---|
| Document No. | Auto | Read-only | — | Number allocated from the Purchase Receipt series when the record is saved. | Gaps are not permitted; cancel rather than delete. |
| Date | Date | Yes | Today | Effective date of the transaction. | Must fall inside an open financial period. |
| Party | Dropdown | Yes | — | The account this transaction is raised against. | Only active parties are listed. |
| Reference | Text | No | — | The other party's document number, for reconciliation. | |
| Narration | Text area | No | — | Explanation carried through to the ledger and the printed document. |
Purchase Receipt fields
Important notes
Section titled “Important notes”Common problems
Section titled “Common problems”The Save button is disabled
A required field is empty or invalid. Fields in error are outlined in red with the reason underneath — scroll up, the first error is usually in the header.
You do not have permission to perform this action
Your role is missing the relevant permission for this screen. Ask an administrator to check it against Roles & Permissions.
The period is closed
The date falls in a financial period that has been closed. Either use a date in an open period, or ask an administrator to reopen it — which affects everyone, so it is rarely the right answer.
The rate comes in as zero
No price is configured for that combination of party and item on this date. Check the applicable price list, and whether its validity window covers the document date.
Frequently asked questions
Section titled “Frequently asked questions”Can I edit a purchase Receipt after saving?
While it is still in Draft, yes — every field is editable. After confirmation only non-financial fields such as Narration can be changed; anything else requires cancelling and re-raising the document.
Why is the document number not sequential?
Numbers are allocated when a document is saved, so a cancelled document leaves its number used. That is intentional: a gap-free series is what makes the audit trail defensible.
Can I change the date after confirming?
No. The date determines which period the entry posts into, so changing it would move an already-posted entry between periods. Cancel and re-raise with the correct date.